Objectives:
Start from Septic cleanout and follow to "Y" connection and then after to original tank. Dig with backhoe on targeted "Y" section until signs of pipes are found. After first cleanout near "Y" was found slower process of excavation is taken with hand-digging and 8 foot breaker bar to find possible targets.
Connection to "Y" with new septic tank will abandon old tank and retain original flow of waste to tank and leech lines. Locate original tank to determine best virgin ground conditions for new septic tank. Locate 3" irrigation main line to water valve source. Scan with USA in live mode and 20" sensor showed PVC large line as a strait red line compared to background colors. When off line, red color stopped and went back to background color. Found valve box and multiple sprinkler lines running from same line across road and into irrigation field.